Tuesday, November 19, 2024
HomeBeyond ParsippanyI-287 traffic shifts to take place this weekend in Morris County

I-287 traffic shifts to take place this weekend in Morris County

I-287HANOVER — New Jersey Department of Transportation (NJDOT) officials today announced traffic pattern shifts are scheduled to be implemented this weekend on I-287 northbound and southbound as construction advances on the roadway rehabilitation project in Morris County.

Beginning at 9:00 p.m. Friday, May 29 until 8:00 a.m. Saturday, May 30, NJDOT’s Contractor, Tilcon of New York, Inc., is scheduled to close two northbound lanes to reposition construction barrier and restripe lanes on the I-287 northbound bridge over Eden Lane in Hanover Township. A third lane may be closed later tonight to set up the new traffic pattern. At least two lanes will be maintained.

The new traffic pattern will remove the single left lane “cattle chute” within construction barriers in the northbound direction and add a fifth lane. The new traffic pattern will shift all five lanes to right of the work zone.

On Saturday, May 30, at 9:00 p.m. through Sunday, May 31 at 8:00 a.m., Tilcon will close up to two lanes on I-287 southbound to shift all four travel lanes to the far right. At least two lanes will remain open. Crews will be setting up a work zone on the left to finish the permanent concrete barrier that divides the northbound and southbound lanes. In the event of inclement weather this weekend, the work will be rescheduled.

The $27.4 million project – which began initial construction activity in September 2012 – is designed to improve the pavement condition on a seven-mile segment of I-287 in both directions from just south of the South Street underpass in Morristown (Milepost 35.4) to the Littleton Road overpass in Parsippany (Milepost 42.2).  The replacement of the bridge decks over Eden Lane in Hanover (Milepost 38.8) is included in the project as are guide rail upgrades, drainage clearing and various other incidental improvements to the highway.

NJDOT has designed the project to advance in stages to minimize impacts to motorists.  All I-287 mainline travel lanes will remain open in each direction during peak-period hours throughout construction, while single and double-lane closures will be allowed during overnight and off-peak hours.  The project is expected to be completed by the fall of 2015.

Portable variable message signs are being utilized to provide advance notification to the motoring public of all traffic pattern changes associated with the work. The precise timing of the work is subject to change due to weather or other factors.  Motorists are encouraged to check www.511nj.org for real-time travel information.

spot_img
spot_img
spot_img
spot_img
Frank L. Cahill
Frank L. Cahill
Publisher of Parsippany Focus since 1989 and Morris Focus since 2019, both covering a wide range of events. Mr. Cahill serves as the Executive Board Member of the Parsippany Area Chamber of Commerce, President of Kiwanis Club of Tri-Town and Chairman of Parsippany-Troy Hills Economic Development Advisory Board.
Recent Articles
- Advertisment -spot_img
- Advertisment -spot_img
- Advertisment -spot_img
- Advertisment -spot_img
- Advertisment -spot_img
- Advertisment -spot_img

Local News

- Advertisment -spot_img
Sign up today for FOCUS NEWSspot_img

Click on image to read magazine

Parsippany Focus Magazinespot_img
Translate »